Home About Die Cutting Division Blister Business Department Hardware Division News Contact
Suzhou Renhe Holding Co., Ltd
Dongguan Renhe Industrial Co., Ltd
Suzhou lianyehe Precision Technology Co., Ltd
CN
×

Suzhou Renhe Holding Co., Ltd. has an annual output of 120 million meters of plastic carrier tape, 200 sets of molds, and 2 million pieces of metal parts. Environmental impact assessment announcement

2021/9/22 11:51:45        371

Suzhou Renhe Holding Co., Ltd. entrusted Jiangsu Shengyutong Environmental Protection Technology Co., Ltd. to compile the environmental impact report form of the project. In order to listen to the opinions and requirements of enterprises and individuals in the project area on the environmental protection of the construction project, it is now The environmental impact report form shall be publicized.


1. The name and summary of the construction project


Project name: 2012-320543-89-01-196284 annual output of 120 million meters of plastic carrier tape, 200 sets of molds, and 2 million pieces of metal parts.


Project Nature: Expansion


Total investment: 20 million yuan


Industry code: C2319 packaging decoration and other printing; C3311 metal structure manufacturing


Construction site: This project is located at No. 1 Maoyuan Road, Wujiang Economic and Technological Development Zone, with Suzhou Qiansu Packaging Material Co., Ltd. and Suzhou Annuo Automation Equipment Factory on the east side of the project; Dayao Port on the south side and Maoyuan Road on the west side; There is an open space on the north side. The nearest sensitive point within 300 meters of the project is the residents of Jingsi Bieyuan about 240 meters to the south of the project.


Project Overview: Suzhou Renhe Holding Co., Ltd. has an annual output of 120 million meters of plastic carrier tape, 200 sets of molds, and 2 million pieces of metal parts. The project is located at No. 1, Maoyuan Road, Wujiang Economic and Technological Development Zone, covering an area of ​​32914m2. After the completion of the project, a total of 205 employees will be required, of which 45 new employees will be added to the project, and 160 original employees will be implemented in a two-shift system with 12 hours per shift, 300 days of work per year, and 7,200 hours per year. The total investment of the project is 20 million yuan, of which the environmental protection investment is 500,000 yuan, which is mainly used for the prevention and control measures of waste gas, waste water and noise and the disposal of solid waste. After completion, it will have an annual production capacity of 120 million meters of plastic carrier tape, 200 sets of molds, and 2 million metal parts.


2. The possible impact of the construction project on the environment


The main influencing factors during the construction period: This project is an existing plant, so the environmental impact during the construction period is mainly some mechanical noise generated during the equipment installation process. The predicted peak source strength can reach about 95dB (A), in order to control the noise pollution during the equipment installation. The construction party should try to use low-noise equipment to avoid high-noise pollution at night and reduce the impact on the acoustic environment around the factory boundary. The impact of the equipment installation period is relatively short-lived. With the completion of the installation and commissioning, the environmental impact during the construction period will cease immediately.


The main influencing factors during the operation period: the domestic sewage of the employees of this project has a certain impact on the water environment; the waste gas in the production process is mainly particulate matter and non-methane hydrocarbons, which will have a certain impact on the environment if improperly treated; the mechanical noise of the production equipment has a certain impact on the surrounding acoustic environment Impact: Metal scraps, plastic scraps, metal shavings, waste cutting fluid, waste lubricating oil, waste engine oil, waste packaging barrels, waste rags, waste activated carbon, crystalline solids, and domestic garbage, etc., will have certain impacts on the environment if stored or handled improperly.


3. Environmental protection measures to be adopted for the construction project


1. Exhaust gas


The waste gas of this project carrying pad printing and baking (including wiping) is treated by the "secondary activated carbon adsorption" device and then discharged through a 15-meter high exhaust cylinder. The waste gas emission meets the Tianjin local standard "Volatile Organic Compound Emission Control for Industrial Enterprises" Standard" (DB12/524-2020) Table 1 standard requirements. The unorganized emissions of this project are mainly non-methane total hydrocarbons produced by machining using cutting fluid and particulate matter produced by cutting. The generated non-methane total hydrocarbons are treated by an electrostatic degreasing device, and the particulate matter is discharged in the workshop after being treated by a mobile bag filter, and the discharge meets the relevant unorganized emission requirements.


2. Wastewater


The drainage system of the project is divided into rain and sewage. Rainwater is discharged into nearby water bodies through the rainwater pipe network. There is no industrial wastewater discharge in this project. Domestic sewage is taken over to the Yundong Sewage Treatment Plant in Wujiang Economic and Technological Development Zone, and the tail water is discharged to Wusong River. The domestic wastewater discharge of this project is 1296t/a, which is within the design load of the sewage plant, and each pollution factor can meet the third-level standard in Table 4 of the "Integrated Wastewater Discharge Standard" (GB8978-1996) (the take-over standard of the sewage plant) ), the wastewater is easier to treat and basically does not impact the wastewater treatment plant. Therefore, the wastewater of this project has less impact on the surrounding surface water environment.


3. Noise


The noise source of the project is mainly the noise generated by CNC lathes, CNC machining centers, milling machines and other equipment during the production process. After taking corresponding measures for noise prevention, noise reduction, and silencing, it is predicted that the noise at the boundary of the plant can reach the Class 3 standard of the "Environmental Noise Emission Standard at the Boundary of Industrial Enterprises" (GB12348-2008).


4. Solid waste


The solid waste generated in this project is mainly metal scraps, plastic scraps, metal scraps, waste cutting fluid, waste lubricating oil, waste engine oil, waste packaging barrels, waste rags, waste activated carbon, crystalline solids and domestic garbage. Domestic garbage is entrusted to the environmental sanitation department for disposal. Metal scraps and plastic scraps are collected and sold outside. Metal scraps, waste cutting fluid, waste lubricating oil, waste engine oil, waste packaging barrels, waste rags, waste activated carbon, and crystalline solids are entrusted to qualified units for disposal. All solid waste is effectively disposed of, and the impact on the surrounding environment is small.


Fourth, the main points of the environmental impact assessment conclusions put forward in the environmental impact report form


Suzhou Renhe Holding Co., Ltd. has an annual output of 120 million meters of plastic carrier tape, 200 sets of molds, and 2 million metal parts in compliance with the principles of environmental management approval for construction projects. Through the engineering analysis and pollution factor analysis of the project, based on the pollution control measures proposed in this report, the pollutants produced have little impact on the surrounding environment. Therefore, the construction of this project on the proposed site is from the perspective of environmental protection. Analysis is feasible.


The above evaluation results are only based on the scale, technology, and layout provided by the builder. If the builder expands the scale, changes the technology, or changes the layout, the builder must apply for approval in accordance with the requirements of the construction project environmental management procedures.


5. Ways for the public to consult the environmental impact report form


Within 2 working days from the date of the announcement, the public can inquire the full version of the project’s environmental impact report form on the publicity webpage. If necessary, they can request more relevant information from the construction unit or evaluation unit by email, telephone, fax, letter, etc. Additional information.


6. Scope and main items of public opinion solicitation


The objects of public participation in this project are mainly the public living along the line. If the public has environmental protection opinions on the construction project, they can submit them to the construction unit and the environmental assessment unit, and leave their name, contact information, and contact address.


The main opinions solicited from the public include the current status of the local environmental quality, the degree of understanding of the project, the degree of impact of the construction and operation of the project on work and life, the attitude to the construction of the project, and other opinions and suggestions.


7. Specific forms of soliciting public opinions. The public can give feedback via telephone, fax, letter, e-mail, etc., or directly to the contact person of the construction unit or environmental assessment unit to give feedback in person.


(1) Contact information of the construction unit


Construction unit: Suzhou Renhe Holdings Co., Ltd.


Contact: Li Heng


Contact address: No. 1, Maoyuan Road, Wujiang Economic and Technological Development Zone


Contact number: 15190001990


Zip code: 215200


(2) The name and contact information of the environmental impact assessment agency


Environmental Impact Assessment Unit: Jiangsu Shengyutong Environmental Protection Technology Co., Ltd.


Certificate Number: BH022370


Address: 12-1519, Area A, Service Trade Zone, No. 268, Lidao Road, Baguazhou Street, Qixia District, Nanjing


Contact: Ye Renfeng


Phone: 13751324376


[Note]: The public is requested to provide as detailed contact information as possible while expressing their opinions.


The announcement shall not be less than 2 working days, and within 2 working days from the date of the announcement, the construction unit will provide relevant information inquiry and reference services for the announcement.

National Service Hotline:
Renhe Holdings-0512-63484919
Renhe industry-0769-85380230
Lianye and precision-0512-63312368
National Service Hotline:
Renhe Holdings-sales@gdrenhe.com
Renhe industry-market@gdrenhe.com
Lianye and precision-sales@gdrenhe.com
Address:
Renhe Holdings-No. 1, MaoYuan Road, Wujiang Economic Development Zone
Renhe industry-No. 6, Tonggu Middle Road, Shangjiao community, Chang'an Town, Dongguan
Lianye and precision-No. 1, MaoYuan Road, Wujiang Economic Development Zone